PEB BUILDINGS VS CONVENTIONAL BUILDINGS

PEB Buildings

Higher resistance to seismic forces due to low weight flexible frames
Reduced time because of international design standards & codes using standard sections and connections
Higher resistance to seismic forces due to low weight flexible frames
30% less PEB steel structures weight through efficient use of steel
Factory controlled quality
Lower initial cost of peb steel buildings(cost per square meter about 30% less than the conventional) and faster delivery
Simple Foundation, easy to construct and light weight of PEB structures
Average delivery time 6-8 weeks

Conventional Building

Special aesthetic design required
Increased design time due to scratch and availability of less design aids
Rigid heavy weight structures not suitable for seismic zones
High weight due to excessive safety factor and the usage of heavier steel sections
Every project to be fabricated at site
Special design and features developed for each project at higher costs
Extensive heavy foundation
Average delivery time 22-28 weeks